Skip to main content
+44 (0) 207 709 2030
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Technologies
      • Automated Total Stations (ATS)
      • Manual monitoring
      • Fibre optic sensors and DFOS
        • Distributed Fibre Optic Sensing (DFOS)
        • Fibre optic sensors
      • Tiltmeters
      • QuickView
      • Geotechnical instrumentation
      • Hydrostatic levelling cells
      • Shape Accel Arrays (SAA)
      • Vibration and noise monitors
      • Dust monitors
    • Services
      • Automated monitoring
      • Survey and Manual Monitoring
      • Distributed Fibre Optic Sensing
      • Software/web-based data presentation
      • Settlement monitoring
      • Excavation support
      • Deformation monitoring
      • Noise, Vibration and Air Quality Monitoring
      • Site Engineering and Setting Out
    • Markets
      • Building Monitoring
      • Rail Monitoring
      • Infrastructure Monitoring
      • Tunnelling
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Sustainability
    • Equality, diversity and inclusion
  • About us
    • GEO-Instruments
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (201)
  • Content page (14)
  • Event (3)
  • Market (4)
  • News article (71)
  • Office (5)
  • Project (32)
  • Resource (52)
  • Service (9)
  • Technology (11)
Request a quote
Get assistance
Network Rail track monitoring for ground reinforcement works
News article

GEO-Instruments survey teams are providing a composite monitoring scheme for Network Rail mainline tracks influenced by an active landslip.

As ground reinforcement works are underway by colleagues in Keller, 500 metres of dual track requires thorough monitoring for potential movement.

/news/network-rail-track-monitoring-ground-reinforcement-works
Ground movement monitoring for road improvement scheme
News article

GEO-Instruments engineers have implemented a monitoring system for an extensive road improvement project in Scotland, incorporating multiple types of geotechnical instrumentation.

/news/ground-movement-monitoring-road-improvement-scheme
Keller and GEO-Instruments cooperate on critical piling job
News article

Keller and GEO-Instruments were on site together again on a small but technically challenging project in a prime location in central London.

/news/keller-and-geo-instruments-cooperate-critical-piling-job
Meet the Team: Marek Wierzchowski
News article

A few weeks ago we took the chance to talk with Marek, who left the GEO-Instruments UK team earlier this year to join our colleagues in GEO-Instruments Poland.

As well as an opportunity to catch up since the big move to his home country, we also asked him about the past, present and…

/news/meet-team-marek-wierzchowski
Ground settlement monitoring for E-scrap recycling facility
News article
… manual plates in the design built in backup data and redundancy in case of failure of the automated system. The automated system provides …
/news/ground-settlement-monitoring-e-scrap-recycling-facility
Structural monitoring of historic Oxford College
News article

GEO-Instruments UK are providing the monitoring scheme for the redevelopment of Hertford College, part of Oxford University.

The college is located in the historic centre of Oxford, among other University buildings and directly next to the iconic Bodleian Library.

/news/structural-monitoring-historic-oxford-college
Meet the Team: Harriet Langfield
News article

Last week Harriet was awarded the Rising Star in Innovation award at the SCCS London Survey Awards dinner. 
A fantastic achievement that recognises her significant contribution to academic excellence and innovation in the industry over the last year.

We took the…

/news/meet-team-harriet-langfield
Monitoring Scheme for DP World London Gateway development
News article
… a geotechnical and structural monitoring scheme for a new area of development at the London Gateway port.  Berth four of the DP World London Gateway Port …
/news/monitoring-scheme-dp-world-london-gateway-development
Reflecting on 2024, Looking ahead to 2025
News article

As GEO-Instruments heads into a busy 2025, we take a moment to reflect on the successes of last year and look ahead to some of the major projects in the year to come.

/news/reflecting-2024-looking-ahead-2025
Meet the Team: Mihhail Lonkin
News article

Today we are talking to Mihhail who has worked at GEO-Instruments UK for several years and has become a crucial member of the team.

Since joining, Mihhail has worked in multiple parts of the business and has spent the last few years working with the GeoSocotec Joint Venture, helping to…

/news/meet-team-mihhail-lonkin
Long-term Ground Monitoring at Seaton Housing Development
News article

For nearly a decade and multiple project phases, GEO-Instruments have been attending site at a housing development project in Seaton, Devon. This is part of an ongoing collaboration with Vertase FLI. 

This month, GEO-Instruments returned to site to support the latest phase of ground…

/news/long-term-ground-monitoring-seaton-housing-development
Footer CTAs
  • Request a quote
  • Contact us

© 2025 Copyright GEO-Instruments  

GEO-Instruments UK
Tower Bridge Business Centre
46-48 East Smithfield
London E1W 1AW

Footer links
  • Keller Group
  • Modern slavery and human trafficking statement

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • Instagram
  • YouTube
Disability Confident Employer logo
Keller Way logo
Supply Chain Sustainability School gold logo
RoSPA Gold Award 2024
Women into Construction logo 2023