Skip to main content
+44 (0) 207 709 2030
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Technologies
      • Automated Total Stations (ATS)
      • Manual monitoring
      • Fibre optic sensors and DFOS
        • Distributed Fibre Optic Sensing (DFOS)
        • Fibre optic sensors
      • Tiltmeters
      • QuickView
      • Geotechnical instrumentation
      • Hydrostatic levelling cells
      • Shape Accel Arrays (SAA)
      • Vibration and noise monitors
      • Dust monitors
    • Services
      • Automated monitoring
      • Survey and Manual Monitoring
      • Distributed Fibre Optic Sensing
      • Software/web-based data presentation
      • Settlement monitoring
      • Excavation support
      • Deformation monitoring
      • Noise, Vibration and Air Quality Monitoring
      • Site Engineering and Setting Out
    • Markets
      • Building Monitoring
      • Rail Monitoring
      • Infrastructure Monitoring
      • Tunnelling
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Sustainability
    • Equality, diversity and inclusion
  • About us
    • GEO-Instruments
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (205)
  • News article (72)
  • Resource (52)
  • Project (32)
  • Content page (14)
  • Technology (11)
  • Service (9)
  • Office (5)
  • Market (4)
  • Event (3)
  • Landing page (3)
Request a quote
Get assistance
Thames Tideway
Project
Thames Tideway Thames Tideway is the new super sewer running through London to alleviate the pressure on the existing system.  Hydrostatic levelling cells A hydrostatic levelling cell The project At…
/projects/thames-tideway
Southbank Place
Project
Southbank Place GEO-Instruments provided monitoring of live London Underground tunnels during the demolition of the old Shell building and the construction of eight new commercial retail and…
/projects/southbank-place
Alexandra Docks Greenport
Project
Alexandra Docks Greenport GEO-Instruments were asked to provide a tailored long term monitoring solution that could withstand underwater conditions. Alexandra Docks Greenport The project GEO-…
/projects/alexandra-docks-greenport
Tilbury Green power station
Project
Tilbury Green power station Tilbury Green Power Limited built a renewable power plant fuelled by waste wood, within the Port of Tilbury on the banks of the River Thames. The plant has capacity of…
/projects/tilbury-green-power-station
University College Hospitals
Project
University College Hospitals University College London Hospitals were building a new proton beam therapy cancer treatment centre in central London. University College London Hospitals The project GEO…
/projects/university-college-hospitals
LU Tunnel and Track Monitoring
Project
LU Tunnel and Track Monitoring Monitoring was required during the construction of residential, office and commercial apartments blocks next to one of the busiest areas in London and above London…
/projects/lu-tunnel-and-track-monitoring
Battersea Power Station
Project
Battersea Power Station Battersea Power Station, which was fully decommissioned in 1983 and given Grade II building status, has undergone an £8bn redevelopment  to provide shops, offices, luxury…
/projects/battersea-power-station
River Thames Retaining Wall Monitoring
Project
River Thames Retaining Wall Monitoring National Grid Gas upgraded the gas supply system in London by replacing part of the medium pressure gas mains beneath the River Thames. This involved monitoring…
/projects/river-thames-retaining-wall-monitoring
Network Rail Retaining Wall Monitoring
Project
Network Rail Retaining Wall Monitoring The construction of a residential apartment block next to Gospel Oak Station, London, led to the need for a retaining wall at the station to be monitored.…
/projects/network-rail-retaining-wall-monitoring
NU Feinberg
Project
NU Feinberg The excavation and structural monitoring of a development at a university in central Chicago. NWU Feinberg development The project To monitor a sheet piled wall, surrounding buildings and…
/projects/nu-feinberg
Wrigley Field
Project
Wrigley Field The existing structure and new construction at Chicago's historic baseball stadium required monitoring. Wrigley Field diagram The project GEO-Instruments carried out monitoring of…
/projects/wrigley-field
Crossrail C412 Bond Street fit out
Project
Crossrail C412 Bond Street fit out GEO-Instruments inspected and maintained a wide range of instrumentation for a key Crossrail site. Crossrail C412 Bond Street The project To take over…
/projects/crossrail-c412-bond-street-fit-out
Beechwood Mansion
Project
Beechwood Mansion As part of the Beechwood Mansion development, the building shell was to be jacked up. The building, therefore, needed to be monitored for any movement. Beechwood Mansion The project…
/projects/beechwood-mansion
Wembley Central
Project
Wembley Central A commercial construction site next to a tube station in Wembley required high resolution settlement monitoring. Settlement monitoring contour map The project Client Bowmer and…
/projects/wembley-central
Elizabeth House, Waterloo
Project
Elizabeth House, Waterloo Elizabeth House is the major new mixed-use redevelopment project adjacent to London’s Waterloo Station. London Underground point cloud data The project The redevelopment…
/projects/elizabeth-house-waterloo
Viking Energy Wind Farm
Project
Viking Energy Wind Farm GEO engineers went to the remote Shetland Islands for a new automated monitoring job. This was a great first opportunity to work on a Wind Farm project and GEO-Instruments’…
/projects/viking-energy-wind-farm
Mytholmroyd Flood Mitigation
Project
Mytholmroyd Flood Mitigation VBA, a joint venture between VolkerStevin, Boskalis Westminster and Atkins, are working in partnership with the Environment Agency and Calderdale Council on the major…
/projects/mytholmroyd-flood-mitigation
Duke Shore Wharf
Project
Duke Shore Wharf The small but critical site at Duke Shore Wharf is part of the Environment Agency’s 10-year plan to strengthen and repair tidal flood defences through London and along the Thames…
/projects/duke-shore-wharf-0
Seaton Housing Development
Project
Seaton Housing Development GEO-Instruments have installed a ground monitoring system to assist with the preparations for a major new housing development. Installation of plates below area to be…
/projects/seaton-housing-development
Track Surveying
Project
Track Surveying Engineers from GEO-Instruments conducted London Underground track surveys near Perivale station in northwest London. Track trolley survey at Perivale station The project A new…
/projects/track-surveying

Pagination

  • Page 1
  • Next page ››
Footer CTAs
  • Request a quote
  • Contact us

© 2025 Copyright GEO-Instruments  

GEO-Instruments UK
Tower Bridge Business Centre
46-48 East Smithfield
London E1W 1AW

Footer links
  • Keller Group
  • Modern slavery and human trafficking statement

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • Instagram
  • YouTube
Disability Confident Employer logo
Keller Way logo
Supply Chain Sustainability School gold logo
RoSPA Gold Award 2024
Women into Construction logo 2023